Software for managing a field

Analyze well performance, forecast production and automate reporting.

Well stock map

Wells
–
Qo, t/day
–
Water cut, %
–
  • Producers
  • Injectors
  • OWC
  • Gathering

hover a well – parameters, click – pin tap a well – parameters

we work with the data your asset already has
Monthly operating reports·Well operating regimes·Production matrices·Daily reports·SCADA / process control·Reservoir simulators·Well logs·Well tests·PVT databases·MS Power BI·Apache Superset·SQL· Monthly operating reports·Well operating regimes·Production matrices·Daily reports·SCADA / process control·Reservoir simulators·Well logs·Well tests·PVT databases·MS Power BI·Apache Superset·SQL·
What the company gets

We make the engineer’s work more interesting and the enterprise more efficient

Engineers stop consolidating spreadsheets by hand – they can work through more wells, select more well-founded interventions, and every effective well intervention brings tonnes of oil and money.

  1. 01
    More productive time Data is collected and validated automatically.Routine calculations are done by the software.The engineer analyses data instead of copying figures from one table to another.
    +30%of productive time
  2. 02
    Data presented clearly Unified reporting forms.Results are easy to verify.Less room for human error.Data always at hand
    24/7access to data
  3. 03
    Additional production and profit Forecasting based on real well performance data.Better planning quality.Decisions are made faster.
    100% of wellsinstead of a sample from memory

The scale of the effect depends on the maturity of the particular asset and its current level of automation.

Solution

How it works

One automation algorithm. We work with the data formats you already have at the enterprise (from Excel to specialised software).

  1. 01
    Data Operating regimes, monthly reports, measurements, telemetry, Excel files
  2. 02
    Collection Automatic loading and quality checks
  3. 03
    Calculations Production forecast, development analysis, KPIs
  4. 04
    Dashboards Charts and tables on phone and computer
  5. 05
    Decisions Managers and engineers act faster
Data stays where it is There is no need to change sources or rebuild asset processes. We work with what you already have: monthly reports, operating regimes, production matrices, daily reports, exports from SCADA and simulators. The connection is set up once.
Validation before calculation, not after the report On load, data goes through control: gaps in measurements, zero production on a working well, outliers, mismatched totals by well pad. The engineer sees the error at import, not the manager in the finished summary.
Calculation by a single methodology Production profiles, decline curves, intervention effect and “what-if” scenarios are calculated the same way for all wells and assets. That is why the figures in the engineer’s report, the manager’s dashboard and the investment estimate agree.
The result is on two screens at once The engineer’s working tools and the manager’s dashboard take data from the same consolidated set. Nobody forwards files or reconciles versions: everyone sees the same picture of the asset for the current day.

The cycle repeats every day with no human involvement.

Who it’s for

Less routine for the engineer. The asset at hand for the manager.

Data from the asset is collected and validated once, then goes to two screens: the engineer’s workstation and the manager’s phone.

vantron.
Consolidation, validation, calculation

Monthly reports · operating regimes · production matrices · daily reports · SCADA – collected and validated once, automatically

two screens
Manager’s phonereal-time asset dashboard
Engineer’s computerworking tools and calculations
For the engineerLess routine
vantron · well operating regime analysis
asset “Vantron-1” · block 1 data as of –
Filters Pad: all Type: prod. Status: active Period: 60 mo Reports Summary Candidates Excel export
Producers138wells
Qo5,760t/day
Ql13,232m³/day
Water cut54.0%
Replacement105%
Oil & liquid ratesover 60 mo
14k7k0
Oct 20Jul 22Sep 24
Qo, t/dayQl, m³/day
Injection & replacementmo.
12k6k0
Oct 20Jul 22Sep 24
Injection, m³/dayReplacement, %
Drilled wells mapNet oil pay, m
024 m
pad: allstatus: activecompletion: AICDsearch: #282 of 282
WellPadTypeStatusCompl.QlQoWCGORNet pay
Well2001
Pad2
CompletionAICD
Start-up after drilling21.11.2018
Lift methodESP-125-2350
Cumulative oil58.4 thousand t
Cumulative liquid114.4 thousand m³
Current water cut69.8 %
Rate and water cut trendwell 2001
14010570350
Nov 18Mar 21Sep 24
Qo, t/dayWater cut, %
Inj. → rate corr.by lag
+0.30−0.3
0 mo6 mo12 mo
positive linknegative
Injector5002
Cumulative injection382.2 thousand m³
Responding wells2
Max. link coeff.0.29
Response time6 mo
Well 50150.29 · lag 6
Well 50060.03 · lag 0
Elementpad 5
282 wells · 18 pads · calculation 4 ms DB: connected

This is how the engineer’s tool works. Open demo →

  • Manual consolidation of Excel tables replaced by import with data validation
  • A single well history instead of scattered folders and archives
  • Intervention candidates ranked by effect – no manual screening
  • Production profile calculation and “what-if” scenarios in one window
For the managerThe asset at hand
9:41
vantron. Asset “Vantron-1” · day
3,391t/day
+2.4% vs plan
Plan completion102 %
Liquid8,603 m³
Water cut54.0 %
Active wells138 wells
Injection8,411 m³
Month to date60,481 t
Oil production3,391
3.6k3.2k2.8k
14 days agotoday
Injection, m³/day8,411
9k6k3k
MonThuSun
Voidage replacement105 %
Intervention candidates · top 4
Well 3007Frac+38 t/day
Well 5014Stimulation+21 t/day
Well 2004ESP swap+17 t/day
Well 61006Sidetrack+14 t/day
Completed year to date54 interventions
Effect confirmed47 of 54
  • Asset indicators on the phone – no need to call the engineer or wait for a summary
  • One source of figures for the planning meeting, the report and the investment decision
  • “What-if” scenarios before approving the intervention programme
  • You can see which interventions worked and which did not pay off
Examples

A working tool, not a presentation.

Demos of software for reservoir engineers and geologists: production forecasting, decline curve analysis (DCA), well operating modes, business plan, daily report and a well flow rate calculator. This is how our tools work on real assets.

Data in the demos is anonymised: well and pad numbers are synthetic, the asset name is fictitious, volumes are scaled. The calculation logic and interfaces are real and working. The demos themselves are in Russian.

Coming soon

Two new engineering software products

Well Test Analysis interprets well tests, Production Profile builds the production profile.

Release on vantron.ru
Coming soon

Well Test AnalysisWell Test Analysis

Well test interpretation software · build-up and drawdown analysis

Load telemetry as it comes from the field – the software cleans the channels, finds periods for interpretation and fits a reservoir model.

  • Automatic period search with a score and a plain-language explanation: “radial flow is visible”, “too few time decades”.
  • Automatic model selection: vertical well, hydraulic fracture, horizontal well with multistage fracturing, reservoir boundaries – with the reasoning behind the choice.
  • Production analysis without shutting in the well: Arps, Duong, SEPD, Ilk–Blasingame, recoverable and movable reserves.
  • PowerPoint report in one click and import from Saphir / Topaze.
PBU · PFOk, skin, wellbore storage, xf, boundaries
5 modelsof decline curves for forecasting
PVTfrom field correlations
Coming soon

Production ProfileProduction Profile

Initial rates and oil production profile calculation

A production profile in minutes, not days – no manual roll-ups, no dragging formulas, no risk of breaking the workbook.

  • Rates of new wells and sidetracks by wellbore for deviated, horizontal and fractured horizontal wells – or load ready-made rates.
  • Production profile of oil, liquid, condensate, dissolved and gas-cap gas – by month and year, with the base stock as a separate layer.
  • Constraints: minimum rate, critical water cut and GOR, limits by pad, gathering facility and field.
  • Excel in and out: templates, paste from clipboard, export in one click.
10⁻⁹match with the original calculations
2 %deviation from the reservoir model for liquid
3.8 %deviation from the reservoir model for oil, 120 wells

Want to try it first? Leave your contact – we will send a link on release day and help you load your data.

How to start

From a pilot on one asset to an AI engineer for the whole company

01

Discussion

We work out which processes take the most engineer time and which adoption level will give a quick effect.

02

Scoping

We choose the starting point – from Excel automation to custom software – to match the scale and maturity of the asset.

03

Launch

We deploy the solution on one asset or process using real data.

04

Scaling

We extend to other assets and move to the next level: an on-premises AI engineer.

Level 05 · Advanced+

The AI engineer of your enterprise

A local AI assistant deployed inside the enterprise perimeter. It remembers the history of every well, knows the regulations and explains why indicators changed – faster than an engineer can open the right folder of reports.

Secure perimeter

The local language model is deployed on the enterprise’s servers or in a closed perimeter – with no data sent to external cloud services. The assistant works even without internet access, entirely within the company’s information security perimeter.

Asset knowledge base

The assistant indexes geological reports, well histories, intervention records, core studies and daily reports – and finds the needed fact in seconds, citing the source, instead of manual searching through folders and archives.

Predictive analysis

By comparing production, intervention history and technical documents, the assistant formulates hypotheses about why indicators changed and proposes intervention candidates – like a second engineer who never forgets the asset’s history.

Integration with asset systems

It connects to corporate SQL databases, SCADA and BI systems, so answers always rely on current data rather than a week-old export.

vantron · AI engineer local, offline

Illustration: an example dialogue with a local AI assistant
All data and calculations stay inside the company’s infrastructure – the assistant works without calling external cloud services.
vantron. digital decision support system

We make data convenient

From a quick start with reporting on VBA to an on-premises enterprise AI engineer – we will choose a solution to match the scale of your tasks and your current infrastructure.

Back to top ↑